- Description
- Specifications
Description
3-Way adjustable screwless visor NTA-8776 certified for E-Bike usage MIPS B-Series Rotational Impact Brain Protection System Full 360-degree fit retention system with 3-way rear height adjustment 14 vents for maximum airflow Full wrap in-mold construction Extended Coverage MTB Trail Helmet Side strap adjusters 5-Star Virginia Tech safety rating
Specifications
Fitment
WARNING: This is a bicycle helmet and not to be used while operating motorcycles or other motorized vehicles.
Troy Lee Designs Flowline Helmet
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
PROP 65 WARNING: Cancer and/or reproductive harm - www.P65Warnings.ca.gov
| SKU | TLD-108959081-P |
| Color | Multi |
| Model | Flowline |