Troy Lee Designs Flowline SE Stealth Black Helmet
Troy Lee Designs Flowline SE Stealth Black Helmet
Troy Lee Designs Flowline SE Stealth Black Helmet
Troy Lee Designs Flowline SE Stealth Black Helmet
Troy Lee Designs Flowline SE Stealth Black Helmet
Troy Lee Designs Flowline SE Stealth Black Helmet

Troy Lee Designs Flowline SE Stealth Black Helmet

https://www.speedaddicts.com/motorcycle/troy-lee-designs-flowline-se-stealth-black-helmet
SKU: TLD-110437001-P
$190.00
EARN 950 ADDICTED REWARDS
Free Shipping No Cost Returns
More Colors
Ready to Ship! Ships FREE Within 3-5 Days
In-Store:
ADD COMBO TO CART
Adding to cart… The item has been added
Talk to a Speed Addict

Please contact us if you have any questions.

1-866-573-2820 Call Live Chat Email Us
  • Description
  • Specifications
Description

WARNING: This is a bicycle helmet and not to be used while operating motorcycles or other motorized vehicles.

Troy Lee Designs Flowline SE Helmet

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating
  • PROP 65 WARNING: Cancer and/or reproductive harm - www.P65Warnings.ca.gov

    Specifications
    SKU TLD-110437001-P
    Color Black
    Model Flowline SE
    Fitment
    Color
    Black
    SIZECHARTURL
    https://d3d71ba2asa5oz.cloudfront.net/12022010/images/flowine-helmet-sizing.jpg
    Model
    Flowline SE
    Helmet Shape
    Intermediate Oval
    Free Shipping
    True
    Addicted Rewards
    950
    YouTube
    k8Nu79Sn78E
    BRANDNAME
    Troy Lee Designs
    MoreColors
    True
    Group ID
    11-FlowlineSE
    Low Stock Threshold
    10
    Returns
    No Cost
    APA Block
    Yes
    Fast and Free Shipping on Orders Over $50
    • Ships fast from your nearest Speed Addicts Fulfillment Center
    • Carefully packaged and guaranteed to arrive in excellent condition
    • Tracking number and delivery notification provided via email
    • Free shipping offer valid for continental US and for orders over $200 to Canada
    • If outside of the lower 48 states please add item to cart for shipping quote
    This item qualifies for Speed Addict's 90-day, no-cost return program. A free return label will be provided for customers within the contiguous United States. Click here to review our full return policy.

    RECOMMENDED PRODUCTS